Control process changes during the final production period
- Reading time
- 3 minutes
- Last reviewed
On this page
Keep the ordinary approval route for process changes working during the final production period. A short remaining order book can create pressure to use a different material, person, machine or method because the usual option is no longer available.
Ask the responsible technical and quality people to assess the actual change. "Only one more batch" describes the quantity of work. It does not establish that the proposed method is suitable.
A last-batch request
Consider a fictional finishing operation. The planned support resource becomes unavailable before the final batch. Someone proposes completing the work through a different route to preserve the closure date.
Before deciding, record:
- The product and batch affected, with the current authorised instruction.
- The precise proposed change and why it is being requested.
- Who will assess technical suitability and the safety implications.
- What quality evidence and customer agreement may be needed.
- The effect on timing if the change is rejected or needs further investigation.
- Who has authority to accept the relevant decisions and where they will be recorded.
This is a request for assessment, not a shortened process-approval procedure. Use the requirements applicable to the product and site. Do not let the project programme supply an approval that belongs to a specialist or customer.
Check why the original route has changed
The proposed change may reveal a wider closure dependency. Perhaps a qualified person is leaving earlier than assumed, a service is scheduled to end or an external processor has a different final acceptance date.
Review task and supervision coverage if the change involves people. A remaining employee's availability does not establish their competence for a new responsibility.
If a utility or site service is involved, bring the request into the factory change programme. Avoid separate teams making incompatible promises about the same service.
Keep the product decision visible
Record the scope of any accepted change, including affected batches and limits. Ensure the people completing and reviewing the work can identify the current authorised instruction. Preserve the earlier evidence where required by the business's controlled process.
If the necessary decision is still open, keep that state visible in the held-work record. Do not turn a pending deviation into accepted stock because a final inventory is due.
HSE organisational-change guidance, for Great Britain, calls for attention to risks during the transition. Use the site's competent review process when closure changes how work is organised; this article does not prescribe operating methods.
A rejected change may alter when equipment is no longer needed. Give UK Auction Group the revised operational facts if an asset-disposal enquiry depends on that timing. Agree the commercial consequences through the proper route rather than assuming a deadline overrides unfinished work.
More decisions appear in the manufacturing site closure guides.
Sources
- UK Auction Group: Business closure Checked
- HSE: Organisational change Checked
This guide is general information and education only. Legal, tax, employment and safety decisions may need a qualified adviser who knows your situation. Read the disclaimer.