Arrange maintenance cover for the overlap between two sites

Topic
Phased moves and business continuity
Reading time
3 minutes
Last reviewed
On this page
  1. Ask about availability before relying on the contact
  2. Test the conflict that could occur
  3. Review the fallback when support is delayed

Name the person who coordinates maintenance requests across both sites during the overlap. Otherwise an old-site breakdown and a new-site start-up problem can each assume they have first call on the same specialist.

Coordination does not make that person competent to diagnose or repair every fault. Their job is to obtain the appropriate response, understand competing commitments and tell operations what remains unavailable.

HSE maintenance guidance, for Great Britain, stresses competent people and planned arrangements. Some equipment may need manufacturer or specialist support. Use those requirements when arranging cover; this article does not provide maintenance methods.

Ask about availability before relying on the contact

A familiar telephone number is not a confirmed appointment. Check whether the provider covers the relevant equipment, the proposed location and the expected period. Ask what information they need before accepting the work and what happens if the problem falls outside their scope.

Build a short response plan around those answers:

Entry What to establish
Request owner Who receives the report and obtains the appropriate technical assessment
Relevant support The competent internal person or agreed external provider for that equipment
Availability Confirmed attendance or response arrangements, including any limits
Concurrent demand Other work already relying on the same person or provider
Business escalation Who reassesses orders and phase commitments if support is unavailable
Record Where the request, advice and agreed next action remain accessible

Keep technical information within the appropriate controlled records. Ask the provider what they need rather than sending an unfiltered collection of old documents or promising that an earlier diagnosis still applies.

Test the conflict that could occur

Consider an old-site machine stopping while the specialist is attending destination work. The site manager needs an authorised technical response and a business decision about affected orders. Simply asking the specialist to "deal with both" leaves the timing unresolved.

Record which commitment changes, who accepts that change and which dependent activities must be reviewed. The two-site people schedule can make this conflict visible before the day starts.

An alternative provider needs appropriate scope and competence. A production deadline does not justify improvising a repair or restarting equipment without the required assessment. Keep the immediate technical decision with the responsible people.

Review the fallback when support is delayed

If the new phase cannot operate, refer to the agreed fallback plan. The old site may no longer offer the option assumed when that plan was written. Recheck its current availability and permissions through the relevant owners.

Give a deputy access to the response record if the usual coordinator is absent. The project absence handover should state which decisions they can make and which need further approval.

Maintenance cover also affects when support equipment becomes surplus. Tell UK Auction Group which items remain operationally committed during the overlap and which are ready for a disposal discussion. Do not promise availability merely because the destination machinery has arrived.

Return to the phased-move hub.

Sources

This guide is general information and education only. Legal, tax, employment and safety decisions may need a qualified adviser who knows your situation. Read the disclaimer.

Releasing surplus equipment?

UK Auction Group surveys the surplus, values it item by item and runs the sale around your operation, so the working site keeps working while the surplus is sold and collected.

Send a list of what you have, where it is and your deadline. Decisions that are still open can be included.

Surplus asset disposal after mergers and restructuring Contact UK Auction Group

Business Closure Guide is part of the UK Auction Group portfolio.

Browse all guides by topic