Handing over project records before the contractor closes

Topic
Construction and fleet wind-down
Reading time
3 minutes
Last reviewed
On this page
  1. Index by purpose and version
  2. Check that the pack answers a real question
  3. Preserve access without copying everything everywhere

Give the receiving person an index of the project records and a way to use them. Sending a large folder is not enough if nobody knows which drawing is current, which manual relates to the installed equipment or which document is still missing.

Start with the records required by the actual project arrangements and relevant responsibilities. Ask the client, project contact and appropriate adviser to confirm the scope. This index does not certify the work or establish that statutory information duties have been fulfilled.

Index by purpose and version

Use the document’s own identifier where available. Record enough context to distinguish it from a similar file without changing its original history.

Field What it should explain
Record and reference The actual document and the project or part it relates to
Version and date Which issue is being supplied and what its status is
Purpose Why the recipient needs it, according to the agreed handover
Intended recipient The authorised person or controlled system receiving it
Delivery evidence What was sent and any acknowledgement or response
Open gap Missing item, disputed version or question, with a named owner

Mark a draft as a draft. Do not rename it “final” merely to make the folder tidy. Where several versions exist, ask the responsible person which belongs in the handover and what history must remain available.

Check that the pack answers a real question

Choose an agreed enquiry, such as locating the operating information for a particular installed item. Ask the intended recipient to find the relevant file using the index. Do not require them to understand an ex-employee’s personal folder names.

If the test fails, identify whether the problem is a missing document, an unclear reference or access. These need different remedies. A fresh export will not fix a drawing that was never supplied.

Use the client handover agenda to obtain a clear response about outstanding items. Keep acknowledgement of receipt separate from acceptance of technical content.

Preserve access without copying everything everywhere

Confirm what happens to the project platform or other hosted service as subscriptions and user accounts change. The software cancellation check helps ask the provider about the actual access and retrieval options.

Use the business’s approved information-handling arrangements. Do not place passwords or unnecessary personal records in the handover pack, and do not assume every recipient should receive the same files.

For project safety information, use the duty-holder enquiry brief. Its scope and recipients need confirmation for the actual project and jurisdiction; a general document index is not a substitute.

Tell UK Auction Group if computers or other contents remain in use for an agreed records task. Give a clear release condition once access and information handling are resolved. Keep client project documents in the controlled business process, separate from the information approved for an equipment sale.

Construction and fleet wind-down

Sources

This guide is general information and education only. Legal, tax, employment and safety decisions may need a qualified adviser who knows your situation. Read the disclaimer.

Closing a business with assets to sell?

UK Auction Group values everything on site, runs the sale and hands the premises back clear, with a full statement of proceeds at the end.

Send a list of what you have, where it is and your deadline. Decisions that are still open can be included.